Hamilton & Waikato · Roofing since 2010

Qualifed Reroofing. Licensed Team. One Quote.

Quality re-roofs with no middleman. You deal straight with Corey and the crew; from the first measure to the final tidy-up.
Get a new roof before those unexpected summer storms hit, most homes done in 2 to 4 days.

combined on the tools
25+ years
across the Waikato
500+ roofs

Residential Re-Roofing

Fast, reliable, no surprises

We work around your day and keep the mess and downtime to a minimum — and you'll get honest updates the whole way through.

  • Accurate project timelines
  • Honest quotes, no hidden fees
  • Corey's crew, never subbies
  • Clean, tidy worksite

Rural & Horticultural

Roofing built for the farm

Sheds, barns, woolsheds and rural homes across the Waikato — built to take the weather and last 50+ years. We plan around the weather forecast and work between milkings, so your shed stays moving.

01 / 03

Industry Certified
RANZ Member
Roofing Association of N.Z.
Approved Installer
COLORSTEEL®
Premium Steel Roofing
New Zealand
NZ Made
100% Local Team & Materials
 

How can we help you?

We have been providing our services across most of the Waikato region and more.

Re-roof prices · 2026

What a metal roof replacement costs

Most Hamilton and Waikato homes cost $18,000–$40,000 to re-roof in new COLORSTEEL MAXAM® long-run, or about $110–$220 per m² of roof. Here's what typical homes come in at, what moves the price, and what's in ours.

Most homes

$18k–$40kabout $110–$220 per m² of roof

  • 2–4 dayson the roof for most homes
  • 10 yearsworkmanship warranty, in writing
Get my free measure & quote

Corey measures your roof, then sends an itemised written quote. No obligation.

Typical Waikato re-roofs

Old iron off, new COLORSTEEL MAXAM® on.

HomeRoof areaThe jobTypical price
Single-storey 3-bedroom140–170 m²Old iron to corrugate$18,000–$26,000
Single-storey 4-bedroom180–230 m²Old iron to trapezoidal rib$24,000–$34,000
Two-storey home130–170 m²Old iron to corrugate, scaffold included$26,000–$36,000

Steep roofs, tight access and rotten battens push a job up the range. Spouting and downpipes are a separate, optional line.

What moves the price

  1. Size and pitchSteel is priced by the square metre, and a steeper roof has more of them.
  2. Storeys and accessTwo storeys need scaffold or edge protection on every side.
  3. What's coming offOld iron strips fast. Heavier roofs take longer to strip and dump.
  4. Roof shapeHips, valleys, chimneys, skylights and flues all need their own flashing work.
  5. The timber underneathSoft battens only show once the old roof is off. Ask how each quote prices them.
  6. ProfileCorrugate and rib are close in price. Your pitch and the look of the house decide it.

In every CTR price

  • Old roof stripped and taken away
  • New MAXAM® long-run, rolled to length
  • Ridge, barge and apron flashings folded to fit
  • Corey's own crew. No subbies.
  • Watertight before we pack up each day
  • Magnet sweep and a walk-around at the end
  • 10-year workmanship warranty, plus the COLORSTEEL® material warranty

These are guide prices, not a quote. When you compare quotes, check that each one says whether GST is included.

See the full cost guide →

Google Reviews

Rated out of 5 by local homeowners

from 9 homeowners across Hamilton & the Waikato

Read all reviews on Google (opens in a new tab) →

“Corey was great to deal with, excellent communications, competitive pricing and a competent group of workers. I would recommend Corey and CTR for any roofing project without hesitation!.”

Max Fairhall — re-roof, four months ago

  • Corey and his team did a great job, with quality workmanship, they were respectful and very tidy, particularly as the weather was not easy to deal with. We wouldn’t hesitate to use or recommend Cory and his team. Many thanks.

    Leanne Mear Google review


  • Corey and his team were super communicative, speedy and professional. We’re so happy with our new roof which was delivered within two weeks of us accepting the quote. Thank you so much CTR.

    Emma Lucas Google review


  • CTR roofing is a great company, Corey is a very decent bloke to work with, no issues, prompt service and it looks mint.

    Evelyn Young Google review

ABOUT US

CTR Roofing Ltd provides top quality residential, rural, and commercial roofing services to the Waikato region.

Over 25 years combined experience in the roofing industry, specialising in new roofs, and reroofing across all sectors.

Every job runs through Corey; RANZ-accredited and a Licensed Building Practitioner with 15+ years in Waikato roofing.

Before we start a single job, we walk you through exactly what we’re doing, why, and what it’ll look like when we’re done.

Frequently Asked Questions About Roofing Hamilton

Discover answers to the most common questions about our roofing in Hamilton and our roofing services. We help make sure you have all the information you need for your next project.
What is the typical timeline for a re-roofing project?
Our re-roofing projects usually take between 2 to 4 days. It can also be up to 1 week depending on the size and complexity of the roof. We strive to minimise disruption to your daily life.
Do you offer warranties on your roofing work?
All our installations come with a 10-year workmanship warranty. If something isn’t right, we come back and fix it — no arguments. Ask us for the details when you get your quote.
Do you work in winter and wet weather?
Yes. We re-roof right through Waikato winters, including in the rain.
We set up the job so your home stays watertight at every stage alongside keeping a close eye on the weather forecast; the only thing that stops us is a serious storm.
Even then we make your roof safe before we leave.
Winter is when most roof problems appear, so it’s often the best time to get sorted, not the worst.
What types of roofing materials do you use?
We use high quality New Zealand steel, Coloursteel MAXAM. Well known and the best roofing steel for Waikato weather conditions. It’s our best choice for your long run roofing needs.
How can I maintain my new roof?
Regular inspections and maintenance, such as cleaning gutters and checking for damage, are crucial.
Can we stay home during a reroof?
Yes, most families stay home. A re-roof is done from the outside, the power and water stay on, and the roof is closed in again at the end of each day. The hardest part is the noise, mostly on the days the old roof comes off.
Read more here: Can we stay home during a reroof?
Does a roofer need to be an LBP?
Only if the re-roof needs a building consent. Roofing on a home is restricted building work when it needs consent, and restricted work has to be done or supervised by a Licensed Building Practitioner (LBP). A like-for-like re-roof that doesn’t need consent isn’t restricted, so the law doesn’t require an LBP.

Read More Here: Does a roofer need to be an LBP?