Re-roofing FAQs · The re-roof process

Will my purlins need replacing with a new steel roof?

Not always. Sound purlins can stay under a new steel roof. The NZ Metal Roofing Code of Practice says the supporting structure should be inspected before installation, with purlins in a true plane and securely fixed. The rest depends on what the inspection finds.

When purlins may need work

  • Soft or split timber. BRANZ says screws need 30 mm of penetration into timber purlins, and damaged timber won't give a sound fixing.
  • Too far apart. BRANZ says pre-1960s homes may have wider spacing than is now permitted. Current spacing depends on the site's wind speed under NZS 3604.
  • No purlins at all. Some older roofs sit directly on timber sarking. BRANZ says purlins may be added over it, if their fixings can resist uplift.

Before anyone measures, look up from inside the roof space with a torch. BRANZ says sarking and damaged framing show from there. Ask how extra timber is priced, and whether you approve it first.

Does changing the framing need consent?

It can. BRANZ says structural changes are restricted building work, for a licensed roofer or an owner-builder. Check with your council before work starts.

Written by the CTR Roofing team, Hamilton. Updated November 2026.